Description
Manufacturer | ABB |
Brand | ABB |
Series | module |
Part Number | PFTL201C 10KN 3BSEN07913R10 |
Product Type | module |
Quality | 100% New Original |
Stock | In stock |
Delivery time | 1-3 days after Payment |
After-sales Service | Have |
Warranty | 1 year |
Shipping term | DHL / FEDEX/ EMS /UPS/TNT/EMS |
Packaging details: if you need an urgent delivery order, please feel free to contact us, and we will do our best to meet your needs.
Price problem: if you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
The instructions below apply to a typical mounting arrangement. Variations are allowed,
provided that the requirements of Section E.4, Installation Requirements are complied with.
If it is necessary to use tubular dowel pins to secure the position of the load cell,
see instructions in Figure E-3.
1. Clean the foundation and other mounting surfaces.
2. Fit the lower adapter plate to the load cell.
Tighten the screws to the torque stated in Table E-1.
3. Fit the load cell and the lower adapter plate to the foundation,
but do not fully tighten the screws.
4. Fit the upper adapter plate to the load cell.
Tighten the screws to the torque stated in Table E-1.
5. Fit the bearing housing and the roll to the upper adapter plate,
but do not fully tighten the screws.
CAUTION
During this operation it is possible to over load the load cells if the operation is
done not careful enough, especially if the roll is heavy. The most critical load
cells are naturally the PFTL 101A-0.5 kN and PFTL 101B-2 kN. Applications
with inclined mounting are most critical.
6. Adjust the load cells so that they are in parallel with each other and in line with the axial
direction of the roll. Tighten the foundation screws, see Table E-1.
7. Adjust the roll so that it is at right angles to the longitudinal direction of the load cells.
Tighten the screws in the upper adapter plate, see Table E-1.