NTDI01 A precise measurement of the reset time requires a relay test set capable of dynamic
operation, with three sequenced stages, each with programmable current levels and time
duration, and flexible external contact triggering. NTDI01 To perform such a test, contact GEGE
Multilin for detailed test instructions.
A simple verification of the reset mode selected with the S4 ELEMENTS GROUND OC
W1 GND TIME OC W1 GROUND TIME OC RESET setpoint is obtained using the setup in
FIGURE 7–9: General test setup on page 7–25. The procedure consists of repetitive
operating time measurements in quick succession. If the reset is selected for
“Instantaneous”, the operating time always equals NTDI01 the nominal time derived from the
selected curve. If the reset is selected as “Linear”, the operating time varies as a function of
the time between successive applications of the current signal. If this test is performed at
current multiples of 2 to 3 times the pickup level, the variations in operating time are easier
to detect.
7.5.10.6 Winding 2 or 3 elements
Because the second ground time overcurrent NTDI01 element could be set with completely
different parameters than the element for the first winding, it is necessary to repeat the full
set of tests described above for each winding.
To test the second element,
Disable all protection elements except for the W2 GROUND TIME
OVERCURRENT (or W3 GROUND TIME OVERCURRENT) element.
Connect the current signal to X = F12 and Y = E12.
Repeat all the tests described for the winding 1 ground time overcurrent
element in this section.
This procedure verifies that the ground instantaneous overcurrent performance matches
the in-service settings. Settings for NTDI01 these elements are found under the S4 ELEMENTS
GROUND OC W1 GND INST OC 1 setpoints menu. If your relay settings require you to
test at current multiples of several times the rated CT secondary value do not leave the
current signal on for more than a few seconds.
7.5.11.2 Winding 1 Element
To ensure only the ground instantaneous overcurrent 1 element operates the trip relays
(and any other output relays) selected by the logic, disable all protection features except
ground instantaneous overcurrent 1. Use the test setup shown in FIGURE 7–9: General test
setup on page 7–25.
Connect the current supply to terminals X = H10 and Y = G10 to test the winding 1
element. Monitor the appropriate output relays as per the relay FlexLogic™ settings or
assigned relay settings.
7.5.11.3 Pickup Level
With the interval timer disabled, apply the current signal and increase its
magnitude until the trip relay (and all the selected auxiliary relays)
operate.
Compare the measured operating NTDI01 level against the S4 ELEMENTS
GROUND OC W1 GND INST OC 1 W1 GND INST OC 1 PICKUP
setpoint.
When the element operates, check that the Trip and Message LEDs are
flashing and one of the following messages is displayed:
LATCHED a: W1 Gnd Inst OC 1 or OPERATED a: W1 Gnd Inst OC
1
Reduce the current until the element resets.
The reset level should be 97% of the operate level. When the element
resets the Trip, Ground, and Message LEDs should remain on if the W1
GND INST OC 1 TARGET was selected as “Latched”. Otherwise, only the
Trip LED should stay on.
Reset indicators and clear messages.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 180 6092 3929
Mail: 2235954483@qq.com
Contact: Chen