Description
3500/22-01-01-02 When increasing or decreasing the zero position voltage, you are actually
mapping the monitor full scale range to a portion of the transducer linear range.
The zero position voltage adjustment range is dependent upon the full-scale
range of the proportional value being adjusted, 3500/22-01-01-02 the transducer scale factor, and
the transducer Ok limits. The following example shows how these parameters are
related to the zero position voltage range.
brand | Product Name | Product model | Order No |
BENTLY | modular | 3500/22-01-01-02 | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1806092-3929 |
- Connect the configuring computer to the rack using one of the methods
listed in the 3500 Monitoring System Rack 3500/22-01-01-02 Configuration and Utilities Guide
(part number 129777-01).
- Run the Rack Configuration Software.
- Initiate communication with the rack by clicking on the Connect option in
the File menu and then selecting the connection method that you used in
step 1.
- Upload the configuration from the rack by clicking on the Upload option in
the File menu.
- Select the Options button on the 3500 System Configuration screen.
- Select the monitor you want to adjust. The Monitor screen will appear.
- Select the Options button under 3500/22-01-01-02 the appropriate Channel. The Channel
Options screen will appear.
- Enter the voltage in the Zero Position or the Gap Position box. Changes
are limited to the values listed adjacent to the box. If you go to the Adjust
screen by selecting Adjust, you can adjust the Zero Position and see the
results.
- Return to the 3500 System Configuration screen by clicking on OK buttons
in the successive screens. The new Zero Position or Gap Position is now
added to the configuration for this channel.
- Download the new configuration to the appropriate monitor by selecting
the Download option in the File menu and then selecting the appropriate
monitor. The new setting for Zero Position will take effect when the
“Download successful” prompt appears.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 180 6092 3929
Mail: 2235954483@qq.com
Contact: Chen