Description
3500/92-02-01-00 Verify Channel Values – Acceleration
The general approach for testing these parameters is to simulate the
Acceleration signal with a function generator and power supply. The channel
values are verified by varying 3500/92-02-01-00 the output from the test equipment and observing
that the correct results are reported in the Verification screen on the test
computer.
brand | Product Name | Product model | Order No |
BENTLY | modular | 3500/92-02-01-00 | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
3500/92-02-01-00 Direct
- Disconnect PWR / B, COM, and SIG / A field wiring from the channel
terminals on the I/O module.
- Connect test equipment and run software as described in section 5.1.9.1
(Test Equipment and Software Setup – Acceleration).
- Calculate the verification frequency 3500/92-02-01-00 using the method in Section 5.1.9.5, page
- Adjust the function generator frequency to the calculated value.
- Calculate the full-scale voltage using the formulas in Section 5.1.9.6, page
- Adjust the function generator (sinewave) amplitude to the calculated
value.
- Verify that the Direct bar graph display and the Current Value Box is reading
±1 % of full scale. If the recorder output is configured, refer to Section 5.1.10
(Verify Recorder Outputs) for steps to verify the recorder output.
- If the reading does not meet specifications, check that the input signal is
correct. If the monitor still does not meet specifications or fails any other part
of this test, go to Section 5.1.11 (If a Channel Fails a Verification Test).
- 3500/92-02-01-00 Disconnect the test equipment and reconnect the PWR / B, COM, and SIG /
A field wiring to the channel terminals on the I/O module. Verify that the OK
LED comes on and the OK relay energizes. Press the RESET switch on the
Rack Interface Module (RIM) to reset the OK LED.
- Repeat steps 1 through 7 for all configured channels
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen