Description
Two CE4001S2T2B4 Ovation Valve Positioner (VP) cards (Primary and Backup) operate as a
Primary backup pair to control a single steam valve (see Figure 25-1). The steam
valve is fifitted with two LVDTs, one connected to each Valve Positioner. Each VP
then drives one coil in a high pressure hydraulic servo valve. The CE4001S2T2B4 coils are
completely isolated.
The Valve Positioners communicate serially to determine which VP should be
Primary, and which should be Backup. Critical parameters of the redundant
subsystem are exchanged over the serial link. These CE4001S2T2B4 critical parameters are also
exchanged over the Ovation bus, thus providing a redundant data path.
brand | Product Name | Product model | Order No |
EMERSON | modular | CE4001S2T2B4 | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The Backup VP suspends its CE4001S2T2B4 software PI routine, and replicates the servo output of
the Primary. It then takes over control if the Primary fails. There are three types of
failures that the subsystem will detect and respond to:
- Hardware Failures – Each VP continuously runs internal diagnostics and will
cease operations if a diagnostic fails. A failure is indicated when both the serial
communications and Ovation line watchdog timers expire. The VP card
continuously executes CE4001S2T2B4 these diagnostics:
— Microcontroller RAM
— Ovation RAM
— EPROM Checksum
— DA Converter Readback
— Ovation Watchdog Timer
— Redundant Communications Watchdog Timer
- Coil Drive – If the Primary VP detects a shorted or open servo coil, it will
transfer control to the Backup VP. There is a customer setup requirement
described in the section on servo coil failures.
- LVDT Failures – LVDT failures are detected by measuring the derivative of
position feedback. As with the servo coil, there are setup requirements that
enable the detection of LVDT problems. The CE4001S2T2B4 requirements are described in the
section on LVDT failures.
The VP pair utilizes the SLIM serial port for VP-to VP communications. The serial
link is a VP-to-VP connection, not the “party-line” bus utilized with the SLIM.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen