Description
GE General Electric Technical Specifications: IS200AEPCH1A
When initially installing an application server or IS200AEPCH1A extension server (that is, Workflow or User) on a 64-bit
computer, you can elect to run the server in either 32-bit or 64-bit mode. If your environment changes
subsequent to installation, you can use the Configure Server
tool to change the architecture mode
accordingly.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200AEPCH1A | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
If you use GE Historian as a data source, then when you upgrade Workflow to v2.5 SP2 the existing GE
Historian server address is automatically displayed in the Server Name field in the
Data Source Editor.
You cannot change the server’s alias (that is the name displayed in the Historian Servers list in the
navigator). To change the alias, you must delete the connection, and then add a new one. For more
information, see Change the Historian Server and Add an Historian Server.
Legacy Certificates
Starting with Workflow 2.5, legacy IS200AEPCH1A certificates are no longer supported.
Upgrading Extension Servers
If you are installing or upgrading an extension server (Workflow or User), you must have already installed
or upgraded an application server of the same version to host the Core services on a separate machine
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen