Description
GE General Electric Technical Specifications: IS200DRLYH1AED
This regulation requires the protection, accuracy, and quick retrieval of all records. Secured, computer
generated, time-stamped audit trails must be available to independently record the date and time of
operator actions that modify the manufacturing process.
Electronic records can be used to identify the ingredients and people involved in the production and
distribution of regulated substances, such as prescription IS200DRLYH1AED drugs. Additionally, electronic records ensure
accuracy, reliability, and security in data collection and record keeping.
Regulated industries that fail to meet 21 CFR Part 11 compliance risk the chance of Inspectional
Observations (483s), warning letters, or the authorized shut-down of one or more operations.
The electronic signature option included with Workflow allows you to design a workflow and associated
Form activities that assist you to meet the IS200DRLYH1AED demands of this regulation. The paperless environment
that results from using this feature benefits you with faster information exchange, improved ability to
integrate, trend and search data, a reduction in errors, and reduced data storage costs.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200DRLYH1AED | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
GE Intelligent Platforms offers 21 CFR Part 11 consulting services to assist you with your goal of
achieving 21 CFR Part 11 compliance. By using these services, you can IS200DRLYH1AED reduce the time, effort, and
expense of developing, implementing, and maintaining a compliant solution to meet the regulation.
These services include:
- Training
- Assessment
- Detailed Detection
- Maintenance
For more information, contact your GE representative.
Audit Trails
Workflow provides audit trail capability that allows you to keep a traceable record of actions that are
performed within your system. Actions that regulators are concerned with are typically those actions that
commonly occur in a production environment.
The audit trail is a key component in a 21 CFR Part 11 compliant system, but it can also be useful in many
different applications. The electronic signature audit trail contains a computer-generated, time-stamped
record of each electronic signature. Each record IS200DRLYH1AED clearly identifies all pertinent information about the
person who entered the signature, such as the person’s name, the time the signature was entered, and,
optionally, comments provided by the signer.
Enabling a workflow may require auditing because that is when the workflow changes are entering the live
process. Actions that are rarely performed can be tracked by using a manual paper system.
When an action that is configured to be audited takes place, an audit record is written to the SQL Server
database. The audit entry in the database includes the following information:
- A time stamp indicating when the record was created.
- An optional time stamp indicating when the action took place.
- The location where the action took place (that is, the assigned equipment resource).
- User context, which is any information related to the audit record and can include a bind to a
workflow variable and/or an expression.
- The associated topic.
Auditing can be enabled or disabled on a per topic basis; however, audit configuration changes and
electronic signatures are always audited, regardless of whether the global auditing is enabled or disabled.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen