Description
GE General Electric Technical Specifications: IS200EHPAG1C
Schedules are used to run a workflow when an event occurs and provide more configuration options for
specific workflows. However, they are created and executed IS200EHPAG1C separately from workflows.
Schedules can be used to override values configured for a workflow, such as task priority, work
instructions, assignments, expiration, and IS200EHPAG1C linked documents. They also provide the ability to enter literal
values for workflow input parameters, as well as bind to variables and event properties.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200EHPAG1C | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
There are four configuration tabs in Workflow Schedules: details, parameters, task details, and tracking
configuration. Each tab, starting with Details, works in IS200EHPAG1C succession and inherits the original properties of
the task details for the selected workflow.
Example
You have a workflow called Machine Cleaning. This workflow is used to clean a number of different
models of mixers. A supervisor selects the workflow, assigns a role, location, and input parameters, and
then schedules it for a IS200EHPAG1C particular day. The workflow is given context with a role, location, the mixer model
to clean, and point in time to execute. When the workflow event and schedule are enabled, the schedule is
available to be executed.
The Overview
tab provides general information about the currently selected schedule.
You can select a workflow to be scheduled, as well as the options related to how the schedule starts.
Schedules are executed based on a timed event, conditional event, production event, or a manual trigger.
When you create a schedule, you must completely configure all elements, except Version, on the Overview
tab. Here, you select the workflow to be scheduled, and then you can either assign an event to trigger the
schedule, or you can manually run the schedule.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen