Description
GE General Electric Technical Specifications: IS200EHPAG1D
By setting the Start Task Filter, you limit a user’s ability to start a particular task in the Task List during
run time. This feature allows you to filter based on the same IS200EHPAG1D criteria as task step assignments. Location
(computer or equipment) and/or personnel (user or personnel class) control the tasks that can be started
by an operator based on credentials and the computer being used.
Event sources are data items that you can subscribe to.
When you configure the scheduled settings in a IS200EHPAG1D workflow schedule or the trigger settings of a condition
event, event source properties are available to define further.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200EHPAG1D | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The Task Details
tab allow you to input more schedule information related to the attached workflow task
or subprocess task step.
The information is inherited from the selected workflow; however, you can override previous
configurations of task/task steps to meet the needs of your workflow schedule.
Task/Task Steps List
This list highlights the current workflow and its subprocesses that are attached to the schedule. Select
the workflow or a subprocess to configure it.
The parameters available in Workflow Schedules are the preconfigured input parameters or data items of
the selected workflow. If the selected workflow has no parameters, no information displays on this tab.
Schedule parameters can be set with a static initial value for the IS200EHPAG1D parameter, or can be bound to any
variable or event property (if an event is attached to the schedule). The values and the types of values
available to be configured depend on the selected workflow. A parameter reconfigured in Workflow
Schedules is saved as part of the schedule configuration and overrides the workflow parameters.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen