Description
GE General Electric Technical Specifications: IS200JPDLG1A
The IS200JPDLG1A MATRIX-80/0EM system should be removed from the
shipping container by removing the foam packing material
surrounding the enclosure carefully. The soft foam inserts
located in the diskette opening should.be removed. Open
the system by pulling the IS200JPDLG1A front bezel off of the system and
remove the foam packing supporting the inside enclosure.
Inspection
Inspect the system for shipping damage. Check the printed
circuit boards located in the card cage to assure that they
are properly seated in the connectors. Check for loose
connectors or wires which may have unseated during
shipment. In case of shipping damage, place a claim against
the shipping agent who delivered the system.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200JPDLG1A | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The system has a 115/230 volt power selection switch S2
on the lower right-hand section of the rear panel to select
IS200JPDLG1A between 115 V ac ± 10% operation or 230 V ac ± 10%
operation. Set the switch so that the primary voltage
available shows through the hole in the rear panel. The disk
drive must be factory configured for either 50 Hz or 60 Hz
(verify correct frequency for your installation on the rear
panel label).
The system can be operated at 100 V ac ± 10%; However,
the following wiring changes must be made.
- Disconnect AC power at the line cord.
- Remove the top of the unit.
- Use drawing in Figure 8 to help identify the wires to be
moved.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen