GE IS200TBAIH1CDC Control system PCB with 2 terminal blocks

Product name:
GE IS200TBAIH1CDC Control system PCB with 2 terminal blocks

Product model: IS200TBAIH1CDC

Quantity: inventory

Part No./PN: IS200TBAIH1CDC

Warranty: We provide warranty service for IS200TBAIH1CDC

Shipping Port:FuJian

Product technical documents: no relevant documents

Category:
Whatsapp:+86 15359293870
WeChat:+86 18106937731
                E-mail:geabbdcs@gmail.com
Contacts:kelly CHEN

Description

GE General Electric Technical Specifications: IS200TBAIH1CDC

The I/O cables which connect to MOX cards installed in the

card cage shciuldbe routed to the right in front of the card

cage through the cable port on the right. The strain relief

bracket on the IS200TBAIH1CDC right is used to secure the flat cables for

distribution to external devices. Sec·ure cables against the

bracket and tighten the two (2) thumbscrews.

MDX Circuit Board Installation

The MOXcircuit boards are installed in the card cage with

components facing to the left (user looking at card cage from

front). The retaining bracket must be removed to install the

Figure 5

IS200TBAIH1CDC cards. Quarter-turn thumb screws are used to install the

retaining bracket. The boards must be installed with the

card ejector up. The MO CC-16 is designed to prevent

backwards installation of the STO BUS boards.

Priority Chain

The card cage is prioritized for interrupts from right to left.

This means the highest priority interrupting device may be

placed in the right-most slot. The lowest priority slot is far

left. For a particular installation requiring both a complete

interrupt· priority daisy chain and an empty slot, wire

wrappable posts are provided on the motherboard for

jumpering the priority chain.

 

brand Product Name Product model Order No
GE Fanuc Module card IS200TBAIH1CDC nothing
Place of Origin Marketable land Imported or not defects liability period
Europe and America Nationwide and overseas yes a year
Place of shipment Delivery method How to use Applicable industries
Xiamen Shunfeng Express Commissioning and installation Power Plant Steel Plant Cement Plant Shipboard Papermaking
Service advantages Foreign import, goods preparation and supply Reasonable price and reliable quality Pictures are for reference only
Product features Primary source of goods, supply by model After sales guarantee Chen 1810693-7731

 

The IS200TBAIH1CDC laO CPU (MK3880-4) features a 158 unit instruction

set, single phase clock input, automatic dynamic memory

refresh and an advanced set of addressing modes. This CPU

generates all of the required addresses and control signals

required for communication and control of data to and from

memories and peripherals. It fetches and executes

instructions and provides most of the timing signals

required for proper operation of the board.

IS200TBAIH1CDC EPROM

The SOlE-COMBO board makes use of Mostek’s

BYTEWYDE memory concept by providing two 28-pin

sockets that accept either 2K by 8 or 8K by 8 ROMs or

EPROMs. When using 2K by 8 memories, each memory

chip is inserted offset into the socket such that pins 1, 2, 27,

and 28 are exposed and therefore not used. The memory

control and addressing circuitry has a feawre which allows

the entire 65K bytes of memory to be addressed directly by

the,user. This is referred to as “Shadow Memory”, In the

SOlE-COMBO board, the term applies to the two EPROM

sockets which may replace a portion of the main 65K of

DRAM after a reset and can be enabled and disabled at will

by any program. This ability of the COMBO to eliminate the

EPROM/ROM socket from the addressing range ofthe Z80

is possible thru software control. Bit 04 of Port E2 controls

this function. Any 2716 or 2764 type EPROM may be used

as long as the access time from JOE is less than 335

nano-seconds.

Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de

livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!

Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen