Description
GE General Electric Technical Specifications: IS200TRPGH2B
A counter can IS200TRPGH2B record the number of filtered
transitions of a particular type. Depending
on the polarity setting, the counter will either
count transitions from 0 to 1, or from 1 to 0.
The IS200TRPGH2B counter “wraps around” from 65 535 to
zero without indication.
Transitions are counted even if the channel is
configured to “latching”.
IS200TRPGH2B Earth leakage detection
Where earth leakage fault detection is
required, a single channel of an 8129-IO-DC
module must be configured to monitor earth
leakage and wired to the appropriate termi
nals of an 8751-CA-NS Controller Carrier.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200TRPGH2B | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
Inputs can be configured to “latch” a partic
ular (filtered) input transition and maintain
the output in the latched state until the latch
is cleared. “Normal Polarity” will latch a tran
sition from 0 to 1 as 1, “Inverse Polarity” will
latch a transition 1 to 0 as 0. The operation is
described in figure 1.
IS200TRPGH2B Normally energized and normally
de-energized outputs
Individual output channels can be either
normally energized or de-energized. Each
output channel comprises 2 switches that
operate in series with the load – one on the
supply line, the other on the return
For normally energized outputs, if a single
switch fails short circuit, the other switch can
still de-energise the load. If either fails open
circuit, the load will be immediately de-ener
gized by the fault.
For normally de-energized outputs, if a single
switch fails short circuit, the other switch can
energise the load. If either fails open circuit,
the load cannot be energized.
Switches are tested by pulsing them ON or
OFF for a maximum of 5 ms – the load must
not respond to this length of pulse. This test
can be disabled if required.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen