GE IS200XDIAG1A IS200XDIAG1 Turbine control plate

Product name:
GE IS200XDIAG1A IS200XDIAG1 Turbine control plate

Product model: IS200XDIAG1A

Quantity: inventory

Part No./PN: IS200XDIAG1A

Warranty: We provide warranty service for IS200XDIAG1A

Shipping Port:FuJian

Product technical documents: no relevant documents

Category:
Whatsapp:+86 15359293870
WeChat:+86 18106937731
                E-mail:geabbdcs@gmail.com
Contacts:kelly CHEN

Description

GE General Electric Technical Specifications: IS200XDIAG1A

IS200XDIAG1A Neutral Time OC 1 Raised Pickup

Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.

Ground Time OC Raised Pickup

Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.

IS200XDIAG1A Sensitive Ground Time OC Raised Pickup

Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.

Neg Seq Time OC Raised Pickup

Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.

Select Setpoint Group

Apply a Cold Load Pickup logic input and verify that the selected setpoint group becomes active. Verify that

settings return to the previous setpoint group after the Cold Load Pickup Block Time interval expires.

 

brand Product Name Product model Order No
GE Fanuc Module card IS200XDIAG1A nothing
Place of Origin Marketable land Imported or not defects liability period
Europe and America Nationwide and overseas yes a year
Place of shipment Delivery method How to use Applicable industries
Xiamen Shunfeng Express Commissioning and installation Power Plant Steel Plant Cement Plant Shipboard Papermaking
Service advantages Foreign import, goods preparation and supply Reasonable price and reliable quality Pictures are for reference only
Product features Primary source of goods, supply by model After sales guarantee Chen 1810693-7731

 

IS200XDIAG1A Procedure To Check Logic and Timers

  1. Make connections per Figure 17–1: RELAY TEST WIRING – WYE CONNECTION or Figure 17–2: RELAY

TEST WIRING – DELTA CONNECTION on page 17–4.

  1. Note that Undervoltage 1 must be programmed, with the function as Trip, and Undervoltage 2 must be Dis

abled.

  1. Assert or De-assert a logic input to simulate a closed breaker.
  2. Inject a balanced three-phase voltage at nominal voltage and frequency into the bus voltage input.
  3. Initially set the undervoltage restoration function setpoint to Alarm, and other setpoints as required.
  4. Turn the voltage off. After the programmed delay Undervoltage 1 should cause a trip, which should not ini

IS200XDIAG1A tiate undervoltage restoration as the breaker is closed. Diagnostic message “Uvolt Restore Init” should not

be displayed.

  1. Assert or De-assert a logic input to simulate an open breaker, which should initiate undervoltage restora

tion. The diagnostic alarm message and LED should be displayed, and any output relays programmed to

operate for this condition should operate.

  1. Change the Undervoltage Restoration function setpoint to Control, and the diagnostic message should

change to control and the ALARM LED should turn off. Return this setpoint to Alarm.

  1. Assert logic input Block Restoration. The diagnostic alarm message and LED should be removed from the

display, and any output relays that operated should reset.

  1. De-assert the logic input. The alarm message and LED should again be displayed and output relays oper

ated. After the delay programmed in Incomplete Sequence Time the alarm message and LED should be

removed from the display and output relays reset.

  1. Return the reduced voltage to nominal, resetting both the undervoltage trip condition and undervoltage

restoration.

  1. Reduce voltage until Undervoltage 1 trips, then immediately return the voltage to nominal. The diagnostic

alarm message and LED should be displayed, and output relays operated.

  1. Provide a Reset to the relay, and the alarm message and LED should be removed from the display and

output relays reset. Remove the Reset.

  1. Arrange the interval timer to start on appearance of voltage and stop when the 2 CLOSE relay operates.
  2. Turn the voltage off to cause an Undervoltage 1 trip, then reset the timer.
  3. Turn the voltage on. The 2 CLOSE relay should operate after the delay programmed in setpoint UNDER

VOLT RESTORE DELAY.

  1. If Undervoltage 2 initiation is to be checked change the UNDERVOLTAGE RESTORATION function setpoint to

Disabled, UNDERVOLTAGE 1 FUNCTION to Disabled, UNDERVOLTAGE 2 FUNCTION to Trip and repeat steps 3

through 7.

Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de

livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!

Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen