3AFE61320946P0001 LDMUI-01 ABB series of goods preparation industrial control industry

Digital model: LDMUI-01
Manufacturer: ABB
Weight: 2Kg
Shipping weight: 2Kg
Quantity: 11
Warranty:1 year
Imported: Yes
Available for sale: nationwide
Shipping term:DHL / FEDEX/ EMS /UPS/TNT/EMS

Category:
Whatsapp:+86 15359293870
WeChat:+86 18106937731
                E-mail:geabbdcs@gmail.com
Contacts:kelly CHEN

Description

LDMUI-01 specific equipment shall be subject to different failure possibilities
(Overload and short circuit) and required branches under various conditions
The compensation amount paid shall be made in solution A or B
Make a choice. In case of short circuit
Solution B, solution A will cause enterprises to use
The household power failure lasts for a long time, so the solution
B is more ideal. But these two solutions are
The effect of solving overload problem is the same. Current electricity
The short circuit possibility of the network is low, such as cable installation
In the cable sleeve with human body protection, and overload
When the possibility is high, the solution is recommended
A。 In addition, the equipment cost of these factors should be weighed
To reduce the cost of solution A.
Based on the above business case assumptions, LDMUI-01 and traditional solutions
Solution A or B


Accumulation that distribution companies can avoid in case of overload
The expenses are shown in Figure | 5.
Compared with the traditional scheme, the solution
Avoidable cumulative opening of distribution company in solution B
The support is shown in Figure 3.6. If there is no enterprise use in the power grid
According to the
Possibility and various situations
Compensation required to be paid under
Amount to select the appropriate
Solution.
5 Avoidable accumulation of power failure lasting for 1 – 12 hours with solution A or B
For more information on EFDP protection, refer to ABB Technology
Application Report, Low Voltage Selectivity of ABB Circuit Breakers, document No
1SDC007100G0204。
Greatly shorten the overall investment payback period. Advanced
Feeder automation solution A or B
The decision must be based on the outage risk assessment. stay
LDMUI-01 adopts solution A or B when appropriate
It is enough to provide a strong “guarantee” for power distribution companies, namely
It can avoid or significantly reduce the compensation caused by power failure
Fines or expenses.
Advanced feeder lines recommended by us are automatically resolved
The payback period of investment in the solution is relatively short, which can be large
Improve the power quality of existing low-voltage distribution network
Bid. This kind of solution can fit the intelligence well
It can meet the demand of power grid and realize high reliability remote monitoring
Control and control, and at the same time, reduce the noise of breaking film to the maximum
Low. It is very easy to overload and it is necessary to
Power grid that needs to pay high compensation to enterprise users
For example, such solutions are ideal.
The service life of the solution equipment is up to 20
In
In addition, the payback period of equipment investment is relatively short
It has great advantages in similar power distribution equipment.

details: if you need an urgent delivery order, please feel free to contact us, and we will do our best to meet your needs.

Price problem: if you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.