When DCS needs to be powered off for maintenance due to major repairs or other reasons, we often directly power off the DCS. However, sometimes this non-standard operation can bring serious consequences, such as configuration loss and PID parameter loss. So it is necessary to strictly check important parameters before and after power outage and re energization, and operate with caution, care, and standardization.
Step 1: Conduct various inspections before power outage. 1. Open the control station cabinet door and observe if the card is working properly and if there are any fault displays; 2. Observe and record the existence of faults from the real-time monitoring fault diagnosis of each operating station; 3. Check whether the power box is working properly, whether the power fan is working, whether the 5V and 24V indicator lights are normal, and measure and record the voltage values; 4. Backup configuration, PID parameters, drivers, and other necessary important data; 5. Check the power supply redundancy, which includes AC power supply redundancy and DC power supply redundancy. AC power supply redundancy: By disconnecting one of the redundant AC~220VAC incoming lines, half of the AC power supply circuit of the system loses power, but the system should still be able to operate normally. The redundancy testing method for DC power supply is as follows: (1) First, disconnect one power supply box and measure the voltage of 5V and 24V on the power terminals of each cage motherboard; (2) First connect one power supply box, then disconnect the other power supply box, and then measure the voltage of 5V and 24V on the power terminals of each cage motherboard. The 5V output voltage of the power box should be between 5.10V and 5.25V, and the 24V output voltage of the power box should be between 23.00V and 25.00V. If the voltage deviation is large, it needs to be checked and handled in a timely manner, otherwise it will affect the normal operation of the card. 6. Check the network cable and layout, check the connection and disconnection of the network cable, confirm whether the connection is in good contact, and replace the faulty cable in a timely manner; 7. UPS test: Test the power supply capacity of the UPS battery by disconnecting the UPS AC incoming line. UPS batteries should be discharged regularly, generally recommended once a month. Discharge method: Disconnect UPS AC power supply and use battery power until the battery is about to be discharged.
The above checks mainly focus on understanding the operating status of the system in advance. If there are any abnormal phenomena, they can be promptly resolved during parking.
Step 2: Cut off the power supply in sequence. 1. After each operation station exits the real-time monitoring and operating system in sequence, turn off the power supply to the industrial control computer and display of the operation station; 2. Turn off the power supply of the control station power box one by one; 3. Turn off the power switches of each branch; 4. Turn off the uninterruptible power supply (UPS) power switch; 5. Turn off the main power switch.
TB711F 3BDH000365R0001
TB711F 3BDH000365R0001
TB711F
TB541-ETH
TB541-ETH
TB521-ETH
TB521-ETH
TB521-ETH
TB521-ETH
TB511-ETH
TB417
TASC-HF-LS3-HF
TASC-HF-LS3-HF
TAS.580.0600G00 V01
TAS.580.0600G00
TAS.580.0560G00
TAS.580.0560G00
TAS.580.0560G00
TAS.580.0550G00
TAS.580.0540G00
TAS.580.0540G00
TACHTROL3 T77310-12
TAC-311DG
TA524
TA524
TA524
TA524
TA521
TA521
TA521
TA25DU
TA25 DU 32
T9902
T9901
T989-3030-18
T989-3030-18
T9882
T9881
T9852
T9852
T9851
T9851
T9833
T9833
T9832
T9832
T9831
T9831
T9803
T9803
T9802
T9802