ABB high-performance CPU processor module PPD512A10-150000 efficient controller

Digital model: PPD512A10-150000
Manufacturer: ABB
Weight: 1Kg
Shipping weight: 2Kg
Quantity: 3
Warranty:1 year
Imported: Yes
Available for sale: nationwide
Shipping term:DHL / FEDEX/ EMS /UPS/TNT/EMS

Category:
Whatsapp:+86 15359293870
WeChat:+86 18106937731
                E-mail:geabbdcs@gmail.com
Contacts:kelly CHEN

Description

▲ PPD512A10-150000 closing/opening operation sequence of grounding switch: opening → closing clockwise; Close → open counterclockwise.
▲ Correct position for closing/opening operation of the grounding switch operating handle: the operating handle shall be inserted in the vertical direction, with the left hand supporting the “L” shaped shaft end of the operating handle, and PPD512A10-150000 grasping the shaft center; Hold the end of the operating handle with your right hand and turn it 180 °. After it is in place, pull out the operating handle horizontally. Note: Do not hold the end of the operating handle with both hands, and do not pull out the operating handle obliquely.


▲ Only when the circuit breaker handcart is in the test position can the grounding switch be opened/closed; When the circuit breaker handcart is in the working position, the grounding switch has been forced to be mechanically locked. At this time, the grounding switch is in the opening position and cannot be operated from opening to closing.
▲ Sliding plate status of grounding switch operating hole: closing – sliding plate facing downward; Opening – the sliding plate springs up.
▲ After the grounding switch is switched off, the slide of the general operation hole can spring up automatically. If the slide has not yet bounced, the circuit breaker handcart will not be able to swing from the test position to the working position, and can only be shaken for nearly two cycles to get stuck. The slide of the operation hole must be manually lifted before operation.
▲ For the operation of the grounding switch from closing to opening, PPD512A10-150000 is generally tighter under normal conditions, which is to ensure the engagement of the grounding switch copper bar and the main bus bar pressure nozzle. If the grounding switch cannot be opened with great force, do not operate it forcibly, otherwise the interlocking mechanism will be damaged. Open the cable chamber door and check whether the grounding switch interlocking mechanism is abnormal and whether the main bus bar pressure nozzle is too tightly engaged.
▲ It is strictly forbidden to open the cable chamber door to operate the grounding switch, otherwise the white plastic closing/opening position indicator of the grounding switch operating hole will shift, and the interlocking mechanism will be inflexible. In special cases, when operating the grounding switch for emergency door opening, insert the special emergency unlocking key of the grounding switch into the long square hole next to the operating hole of the grounding switch, and operate after unlocking.
▲ When the incoming cabinet is equipped with a grounding switch, special attention should be paid to it before high-voltage power transmission. Please ensure that the grounding switch is in the off position before high-voltage power transmission, otherwise an accident will occur.
▲ The grounding switch is equipped with a forced locking electromagnet DTN: (its resistance value: about 2K Ω for DC110V; about 8K Ω for DC220V), the circuit breaker handcart is in the test position, the grounding switch needs to operate from opening to closing, and its forced locking electromagnet must be powered on, otherwise the slide of the operating hole cannot be pressed down, and the operating handle of the grounding switch cannot be inserted for operation. If the high-voltage is not electrified and there is no secondary control power supply, in case of emergency, the cable chamber door can be unlocked and opened, then the front right sealing plate can be opened, and the iron core of the locking electromagnet can be pressed in manually to press down the slide plate of the operation hole and operate the grounding switch.
Note: In case of high voltage electrification, especially when the incoming cabinet is equipped with a grounding switch, this operation is strictly prohibited, otherwise an accident will occur.
4.4.1 Operation of grounding switch from opening to closing
(1) Confirm that the circuit breaker handcart is at the test position, the grounding switch is at the opening position, and the high voltage is not charged.
(2) Close the secondary control power supply, the grounding switch locking electromagnet makes a closing sound, and close the cable chamber door.
(3) Press down the sliding plate of the operating hole of the grounding switch, and insert the operating handle of the grounding switch into the operating hole in the vertical direction to cover the hexagonal operating shaft.
(4) The left hand helps the “L” shaped shaft end of the operating handle to grasp the shaft center; Hold the end of the operating handle with your right hand and turn it 180 ° clockwise or vertically.
(5) After the operating handle is in place, pull out the operating handle horizontally. At this time, the slide of the operating hole can generally spring up automatically. If the slide cannot spring up, lift the slide manually.
(6) The white plastic position indicator of the operating hole of the grounding switch indicates red “1”; The position display of the grounding switch on the upper door panel shows a red “1”, indicating that the grounding switch is closed.
4.4.2 Operation of earthing switch from closing to opening
Operate in reverse order according to 4.4.1.
4.5 Operation of closing and opening cabinet door
4.5.1 Operation of closing and opening the upper cabinet door
(1) Close the upper cabinet door: insert the cabinet door key horizontally into the key hole in the middle of the upper cabinet door, and turn it about 120 ° counterclockwise to the left to close the cabinet door inwards. At this time, the cabinet door key should also be included in the key hole. Continue to turn the key about 120 ° clockwise to the right, fasten the cabinet door, and then pull out the key.
(2) Opening of the upper cabinet door: insert the cabinet door key horizontally into the key hole in the middle of the upper cabinet door, turn it about 120 ° counterclockwise to the left, and then open the cabinet door outward. At this time, the cabinet door key should also be included in the key hole. Continue to turn the key about 120 ° clockwise to the right, and then pull out the key.
Note: If the cabinet door key cannot be inserted into the key hole in the middle of the upper cabinet door, the upper cabinet door cannot be closed and opened. Solution: When the upper cabinet door is already open, pull the long interlocking rod inside the upper cabinet door down to the right place to insert the key; When the upper cabinet door is already closed, use pointed nose pliers to push the slots on both sides of the key hole to the horizontal position to insert the key.

details: if you need an urgent delivery order, please feel free to contact us, and we will do our best to meet your needs.

Price problem: if you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.