LXN1604-6 The simple test setup shown below can be used for the majority of tests. When the diode is
not shorted and the two currents are summed together prior to the switch, the composite
current contains the 2nd harmonic necessary LXN1604-6 to verify the 2nd harmonic restraint of the
harmonic restraint percent differential elements. With the diode shorted and the two
currents fed to separate relay inputs, the slope of the differential elements can be
measured. With only I 1 connected (with a return path) the pickup level of any element can
be measured.
Review appropriate sections of this manual to familiarize yourself with
the relay. Confidence in the commissioning LXN1604-6 process comes with
knowledge of the relay features and methods of applying settings.
Verify the installation to ensure correct connections of all inputs and
outputs.
Review the relay settings and/or determine features and settings
required for your installation. In large utilities a central group is often
responsible for determining which relay LXN1604-6 features will be enabled and
which settings are appropriate. In a small utility or industrial user, the
on-site technical person is responsible both for the settings and also for
the complete testing of the relay.
Set the relay according to requirements.
Ensure that the correct relay model has been installed. A summary table
is available in this manual for users to record all the relay settings.
When the testing is completed, verify the applied relay settings, and
verify that all desired elements LXN1604-6 have been enabled, using the EnerVista
745 Setup software or the relay front panel.
Verify that the relay rated AC current matches the CT secondary value.
Verify that the relay rated AC voltage matches the VT secondary value.
Verify that the relay rated frequency setting matches the power system
frequency.
Open all blocking switches so as not to issue an inadvertent trip signal to
line breakers.
Verify that the auxiliary supply matches relay nameplate. Turn the
auxiliary supply on.
Verify that all grounding connections are correctly made.
To facilitate testing it is recommended that all functions be initially set to Disabled. Every
feature which will be used in the application should be set per desired settings, enabled for
the specific commissioning test LXN1604-6 for the feature, then returned to Disabled at completion of
its test. Each feature can then be tested without complications caused by operations of
other features. At the completion of all commissioning tests all required features are then
Enabled.
It is necessary to keep track of modifications/changes made to settings during the
course of these commissioning steps and ensure that all settings are returned to the
‘in-service’ values at the end of the tests, prior to placing the relay into service.
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 180 6092 3929
Mail: 2235954483@qq.com
Contact: Chen