ABB REF541KM118AAAA feeder protection device

Digital model: REF541KM118AAAA
Manufacturer: ABB
Weight: 1Kg
Shipping weight: 2Kg
Quantity: 6
Warranty:1 year
Imported: Yes
Available for sale: nationwide
Shipping term:DHL / FEDEX/ EMS /UPS/TNT/EMS

Category:
Whatsapp:+86 15359293870
WeChat:+86 18106937731
                E-mail:geabbdcs@gmail.com
Contacts:kelly CHEN

Description

Standardized operation steps for power failure of ABB high-voltage cabinet REF541KM118AAAA.
5.2.1 Preparations before power failure of ABB high-voltage cabinet
(1) Confirm which high-voltage power is to be disconnected. Incoming cabinet, PT cabinet, motor feeder cabinet, or station transformer feeder cabinet?
(2) In order to ensure that the equipment of the next level circuit is not affected, REF541KM118AAAA recommends that the equipment load of the next level circuit be normally disconnected first.


5.2.1 Operation steps for power failure of ABB high-voltage cabinet
(1) Disconnect the main circuit of the corresponding ABB high-voltage cabinet that requires power failure.
① If it is necessary to disconnect the circuit breaker cabinet, directly open it locally, the three-phase indicator lights L1, L2 and L3 of the high-voltage live display will automatically go out, and the “LOCK” locking indicator will automatically go out;
② If the PT cabinet is overhauled, the PT handcart can be directly pulled out, and the PT disconnection and voltage loss lockout can be performed. Other high-voltage cabinets can operate safely without tripping. Note: At this time, the primary busbar at the upper end of the PT cabinet is still high-voltage charged, the high-voltage charged display is still indicating normally, and the door of the cable chamber of the PT cabinet cannot be opened, unless the main circuit of the incoming cabinet is disconnected, REF541KM118AAAA.
(2) Shake the circuit breaker handcart out of the working position to the test position, and the sliding plate of the grounding switch operating hole shall be able to press down normally.
(3) If the high-voltage part of the circuit breaker cabinet is overhauled, the grounding switch should also be closed to ensure the safe grounding of the next main circuit.
(4) If the main switch room of the high-voltage cabinet or the circuit breaker is overhauled, the secondary aviation plug of the circuit breaker shall also be pulled out and the circuit breaker shall be removed to the service trolley.

details: if you need an urgent delivery order, please feel free to contact us, and we will do our best to meet your needs.

Price problem: if you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.