Description
125840-01 Take note of the following items when daisy chaining Rack Interface I/O Modules:
- Use the HOST port to connect to the host computer or to the rack in the daisy
chain that is closer to the host computer.
- Use the RACK RS-422 port to connect to the rack that is farther from the host
computer.
- Use the following cables for the connection between the racks in the daisy
chain:
-125840-01 For lengths of 150 meters (500 ft) or less, use cable
- 130122-XXXX-XX (PVC Insulation) or cable 131107-XXXX-XX (Teflon®
Insulation).
– For lengths greater than 150 meters (500 ft), use one cable
– 130122-XXXX (PVC Insulation) or cable 131107-XXXX-XX (Teflon®
Insulation) along 125840-01 with as many RS-422 extension cables
– 130121-XX-XX (150 meters (500 ft) standard length) to create a
cable up to 1220 meters (4000 ft) in length.
Refer to Section 7 for the specific options for the cables listed above
brand | Product Name | Product model | Order No |
BENTLY | modular | 125840-01 | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1806092-3929 |
125840-01 To remove a terminal block from its base, loosen the screws attaching the
terminal block to the base and then grip the block firmly and pull. Do not pull the
block out by its wires because this could loosen or damage the wires or
connector.
Typical I/O Module
Refer to the 3500 Field Wiring Diagram Package for the recommended wiring.
Also, do not remove more than 6 mm (0.25 inches) of insulation from the wires.
The Data Manager I/O Module must be installed
behind the Power Supplies between the Power Input
Modules and the Rack Interface I/O Module (in a Rack
Mount or Panel Mount rack) or above the Power
Supplies between the Power Input Modules and the
Rack Interface I/O Module (in a Bulkhead rack). The
125840-01 function of the Data Manager I/O module is to connect
the 3500 rack to TDIX or DDIX Communication
Processors. Each port can connect up to 24 channels,
from the 3500 rack to the Communication Processor.
Refer to the table on page 12 for the different options
that are available.
1) Used to transfer the static information from Port 1 of
this 3500 rack to the static connector on the
Communication Processor.
2) Used to transfer the 125840-01 dynamic information from Port
1 of this 3500 rack to the dynamic connector on
the Communication Processor.
3) Used to transfer the information from Port 2 of this
3500 rack to the static connector on the
Communication Processor.
4) Used to transfer the dynamic information from Port
2 of this 3500 rack to the dynamic connector on
the Communication Processor
This section shows how to verify that the Rack Interface Module and the I/O modules
are operating correctly. When performed properly, this module may be installed into
or removed from the rack while power is applied to the rack. Refer to the Rack
Installation and Maintenance Manual (part number 129766-01) for the proper
procedure.
5.1 RIM Host Port Test Utility
Use the RIM Host Port Test Utility to verify that the HOST ports on the Rack
Interface Module and the Rack Interface I/O Module are operating properly.
Before running the RIM Host Port Test Utility, connect Cable 130118-XXXX-XX
(Host to 3500 Rack RS-232 Interface Cable) between the Configuration Port
connector on the front of the Rack Interface Module or to the HOST connector on
the Rack Interface I/O Module and the computer that has the utility installed.
Refer to the 3500 Monitoring System Rack Configuration and Utilities Guide and
the Rack Configuration Software for the details of this utility
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 180 6092 3929
Mail: 2235954483@qq.com
Contact: Chen