Description

3500/15-03-02-00 The general approach for testing these parameters is to simulate the eccentricity

signal with a function generator and power supply. The output levels are verified

by varying the output from the test equipment and 3500/15-03-02-00 observing that the correct

results are reported in the Verification screen on the test computer.

 

brand Product Name Product model Order No
BENTLY modular 3500/15-03-02-00 nothing
Place of Origin Marketable land Imported or not defects liability period
Europe and America Nationwide and overseas yes a year
Place of shipment Delivery method How to use Applicable industries
Xiamen Shunfeng Express Commissioning and installation Power Plant Steel Plant Cement Plant Shipboard Papermaking
Service advantages Foreign import, goods preparation and supply Reasonable price and reliable quality Pictures are for reference only
Product features Primary source of goods, supply by model After sales guarantee Chen 1806092-3929

 

    1. Disconnect PWR, COM, and SIG field wiring from the channel terminals on

    the I/O module.

    1. Connect test equipment and run software as described in section 5.1.6.1

    (Test Equipment and Software Setup – Eccentricity).

    1. Calculate the full-scale voltage according to the 3500/15-03-02-00 following equation and

    examples.

    Verification Input Signal =

    Peak to Peak Meter Full-scale × Transducer Scale Factor

    1. Adjust the function generator amplitude for the calculated full scale. Verify

    that the pp bar graph display and the Current Value Box is reading ±1 % of

    full scale. If the recorder output is configured, refer to Section 5.1.9 (Verify

    Recorder Outputs) for steps to verify recorder outputs.

    1. If the reading does not meet specifications, check that the input signal is

    correct. If the monitor still does not meet specifications or fails any other

    part of this test, go to Section 5.1.10 (If a Channel Fails a Verification Test).

    1. 3500/15-03-02-00 Disconnect the test equipment and reconnect the PWR, COM, and SIG field

    wiring to the channel terminals on the I/O module. Verify that the OK LED

    comes on and the OK relay energizes. Press the RESET switch on the Rack

    Interface Module (RIM) to reset the OK LED.

    1. Repeat steps 1 through 6 for all configured channels.

    Gap

    1. Disconnect PWR, COM, and SIG field wiring from the channel terminals on

    the I/O module.

    1. Connect test equipment and run software as described in section 5.1.6.1

    (Test Equipment and Software Setup – Eccentricity).

    1. Adjust the power supply to produce a voltage equal to -18.00 Vdc on the

    Gap bar graph display. Verify that the Gap bar graph display and the

    Current Value Box is reading ±1 % of -18.00 Vdc. If the recorder output is

    configured, refer to Section 5.1.9 (Verify Recorder Outputs) for steps to

    verify the recorder output.

    1. Adjust the power supply to produce a voltage equal to the mid-scale on

    the Gap bar graph display. Verify that the Gap bar graph display and

    current value box is reading ±1 % of the mid-scale value. If the recorder

    output is configured, refer to Section 5.1.9 (Verify Recorder Outputs) for

    steps to verify the recorder output.

    1. 3500/15-03-02-00 If the reading does not meet specifications, check that the input signal is

    correct. If the monitor still does not meet specifications or fails any other

    part of this test, go to Section 5.1.10 (If a Channel Fails a Verification Test).

    1. Disconnect the test equipment and reconnect the PWR, COM, and SIG field

    wiring to the channel terminals on the I/O module. Verify that the OK LED

    comes on and the OK relay energizes. Press the RESET switch on the Rack

    Interface Module (RIM) to reset the OK LED.

    1. Repeat steps 1 through 6 for all 3500/15-03-02-00 configured channels.

Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!

 

Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 180 6092 3929
Mail: 2235954483@qq.com
Contact: Chen