Description
GE General Electric Technical Specifications: IS200DTAOH1ABA
The IS200DTAOH1ABA guidelines described here are not the only aspects of a system to be considered to ensure optimum
performance. Each individual system should be evaluated for other potential sources of performance
issues. Examples of other sources of problems may include, but are not limited to, the following:
- Networking throughput between Workflow server and client
- Networking throughput between Workflow server and SQL Server
- Data throughput between the Workflow server IS200DTAOH1ABA and data sources such OPC servers, Historian, iFIX,
and CIMPLICITY.
- The number of client instances active on a single client machine
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200DTAOH1ABA | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
Hardware Requirements for an IS200DTAOH1ABA Application Server
This topic describes the hardware required for your product installation.
- 4-socket 8 core 32 GB RAM
- Windows Server x64 OS
- 200 GB free hard disk space
- Network interface software for network communications, and TCP/IP network protocol
- SVGA or better color graphics monitor and a 100% IBM-compatible 24-bit graphics card capable of
1024×768 resolution and at least 65535 colors
- XGA or better color graphics monitor and a 100% IBM-compatible 24-bit graphics card capable of
1024×768 resolution and at least 65535 colors
- Two-button mouse with a scroll wheel or compatible pointing device (such as a touch screen)
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen