Description
GE General Electric Technical Specifications: IS200EDCFG1AED
When a global subprocess is inserted into a workflow, you can change it to a local subprocess. Then, you
can configure the subprocess to meet the specific needs of the IS200EDCFG1AED currently selected workflow.
There are properties that exist in the workflow or process scopes that are defined on a workflow’s process
step. They are supplied by the workflow engine and are available when authoring a global subprocess.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200EDCFG1AED | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
Activities comprise the main building blocks or steps that perform the actions in a subprocess or
workflow.
Within each activity, there are a number of dependencies and relationships that can be created to other
activities within subprocesses. The behavior of IS200EDCFG1AED activities are configured through their properties and
variables. Variables can also be used to output results from the activity’s execution.
For example, some activities, such as the parallel activity, can have other activities placed inside them. By
doing so, processes can be expanded and the branched activity can run more simultaneous activities to
complete the required result.
Common Properties
You can configure the following common properties IS200EDCFG1AED for each step contained within a workflow: name,
description, and the enabled feature.
The steps in a workflow where you can configure these properties include: load, preprocess,
presubprocess, subprocess, postsubprocess, postprocess, and unload. Setting these attributes allows
you to identify an activity or a subprocess within a workflow, as well as decide whether or not to include
the step in the workflow instance.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen