Description
GE General Electric Technical Specifications: IS200ERRRH1A
IResourceLinking allows you to work with resource links for IS200ERRRH1A all types of resources. You can start, edit, end,
and query links between resources in your system.
Using resource links, you can create a link between any two resources. This allows you to track all the
links for a specific resource or for a specific time period. For example, you can create one link between
an engine and an aircraft for a specified time period, and a second link IS200ERRRH1A for the same engine and another
aircraft for a different time period.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200ERRRH1A | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
On the activity configuration panel, you can use a bind or expression
to define your input and output
parameters.
Subtopics in this section describe each service method for this service interface.
AlterResourceLink (IResourceLinking)
Modifies an existing user-defined resource link.
The Task List is an interactive display that IS200ERRRH1A provides users with information regarding task and task steps
of a running workflow.
The Task List allows a user to view or perform a variety of workflow tasks, as well as to monitor the
progress of a these tasks. Within this list, an operator can view one or more tasks awaiting user attention.
The displayed tasks are determined by the logged in user ID, user role, and the equipment location of
the physical computing resource presenting the client application. This Task List is a component that
manages the interaction between operators and the workflow execution engine. It enables workflows that
require human interaction to progress.
The Task List also enforces authorization of specific Task List actions through the use of Workflow
security and role definitions. For example, the logged in user may have the ability to start a task but not
skip a task, or delegate the task to someone else.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the delivery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen