Description
GE General Electric Technical Specifications: IS200ICIAH1A
As a safeguard, the PHASE CT PRIMARY and Generator Parameters setpoints are defaulted to “——–” (indicating not pro
grammed) when shipped from the factory. The IS200ICIAH1A will indicate that it was never programmed. Once these values are
entered, the IS200ICIAH1A will be in service. The phase CT should be selected such that the maximum fault current does not exceed
20 times the primary rating. When relaying class CTs are purchased, this precaution will help prevent CT saturation under
fault conditions. The secondary value of 1 or 5 A must be specified when ordering so the proper hardware will be installed.
The
PHASE CT PRIMARY setpoint applies to both the neutral end CTs as well as the output CTs.
For high resistance grounded systems, sensitive ground current detection is possible if the 50:0.025 ground CT is used. To
use the 50:0.025 ground CT input, select 50:0.025 for the GROUND CT setpoint. No additional ground CT messages will
appear. On solid or low resistance grounded systems, where fault currents may be quite large, the 489 1 A/5 A secondary
ground CT input should be used. The Ground CT primary should be selected such that potential fault current does not
exceed 20 times the primary rating. When relaying class CTs are purchased, this precaution will ensure that the Ground CT
does not saturate under fault conditions.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200ICIAH1A | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The seven General Input functions are flexible enough to meet most of the desired digital input requirements. The asserted
state and the name of the digital inputs are programmable. To disable the input functions when the generator is offline, until
some time after the generator is brought online, a block time should be set. The input functions will be enabled once the
block delay has expired. A value of zero for the block time indicates that the input functions are always enabled.
Inputs may be configured for control, alarm, or trip. If the control feature is enabled, the assigned output relay(s) operate
when the input is asserted. If the PULSED CONTROL RELAY DWELL TIME is set to 0, the output relay(s) operate only while the
input is asserted. However, if a dwell time is assigned, the output relay(s) operate as soon as the input is asserted for a
period of time specified by the setpoint. If an alarm or trip is enabled and the input is asserted, an alarm or trip will occur
after the specified delay
Once the IS200ICIAH1A is in service, it may be tested from time to time as part of a regular maintenance schedule. The unit will have
accumulated statistical information relating historically to generator and breaker operation. This information includes: last
trip data, peak demand data, MWh and Mvarh metering, parameter averages, RTD maximums, analog input minimums and
maximums, number of trips, number of trips by type, number of breaker operations, the number of thermal resets, total gen
erator running hours, and the event record. When the unit is under test and one of the inputs is assigned to the Test Input
function, shorting that input will prevent all of this data from being corrupted or updated.
If an input is assigned to the tachometer function, it may not be used here.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
The maximum number of 8-Channel Analog Current/Voltage Output modules that can be installed
in a system are:
4 in a system using CPU Models 311, 313, or 323
8 in a system using CPU Model 331
32 in a system using CPU Models 340 and 341
64 in a system using CPU Models 350 – 364
Other Configuration Considerations
When planning the module configuration for your application you must also consider the load
capacity of the installed power supply and the total load requirements of all modules that are
installed in the baseplate.
Refer to Chapter 1 in this manual for details on power supply, baseplate, and module load
requirements. The following table lists the specifications for this module. Note that test conditions,
unless otherwise noted, are: VUSER = 24 VDC at an ambient temperature of 25 C (77 F)
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen