GE General Electric Technical Specifications: IS200ISBDG1AAA
The purpose of this testing description is to demonstrate the procedures necessary to perform a complete functional test of
all the IS200ISBDG1AAA hardware while also testing firmware/hardware interaction in the process. Since the IS200ISBDG1AAA is packaged in a dra
wout case, a demo case (metal carry case in which the IS200ISBDG1AAA may be mounted) may be useful for creating a portable test set
with a wiring harness for all of the inputs and outputs. Testing of the relay during commissioning using a primary injection
test set will ensure that CTs and wiring are correct and complete.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200ISBDG1AAA | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The IS200ISBDG1AAA tests are listed below. For the following tests refer to Figure 7–1: SECONDARY INJECTION TEST SETUP on
page 7–2:
- OUTPUT CURRENT ACCURACY TEST
- PHASE VOLTAGE INPUT ACCURACY TEST
- GROUND, NEUTRAL AND DIFFERENTIAL CURRENT ACCURACY TEST
- NEUTRAL VOLTAGE (FUNDAMENTAL) ACCURACY TEST
- NEGATIVE SEQUENCE CURRENT ACCURACY TEST
- RTD ACCURACY TEST
- DIGITAL INPUT AND TRIP COIL SUPERVISION TEST
- ANALOG INPUT AND OUTPUTS TEST
- OUTPUT RELAY TEST
- OVERLOAD CURVE TEST
- POWER MEASUREMENT TEST
- REACTIVE POWER TEST
- VOLTAGE PHASE REVERSAL TEST
For the following tests refer to Figure 7–2: SECONDARY INJECTION SETUP #2 on page 7–12:
- GE POWER MANAGEMENT (HGF) GROUND CURRENT ACCURACY TEST
- NEUTRAL VOLTAGE (3RD HARMONIC) ACCURACY TEST
- PHASE DIFFERENTIAL TRIP TEST
For the following test refer to Figure 7–4: SECONDARY INJECTION TEST SETUP #3 on page 7–15:
- VOLTAGE RESTRAINED OVERCURRENT
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen