Description
GE General Electric Technical Specifications: IS200STCIS6AED
The IS200STCIS6AED MDX-BCLK module has on-board rechargeable
batteries. Pins 3-4 on header J4 allow disconnection of
these batteries when the system is to be powered down and
the clock function is not needed. Removing the jumper
disconnects the batteries, thus IS200STCIS6AED preventing discharge.
The MDX-BCLK module can function with a 5 volt supply
because the 12 volt supply is only used to decrease battery
charge time. In order to select 5 volt only operation, pins 1
and 2 must be strapped on Header J4. Note: this mode
increases the charge time to 36 hours for a full charge at
25°C.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200STCIS6AED | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The power fail detection circuit senses when the 5 volt
supply to the BCLK falls below 4.7 volts. If the 5 volt line
remains IS200STCIS6AED below this threshold for more than 9 microseconds,
access to the board will be disabled. The 9 microsecond
delay is a result of the RC time constant used in the SPF,
system powerfail circuitry. This circuitry is composed ofthe
ICL 8211, U1 (voltage reference); an MC14538B, U2 (dual
multi-vibrator); and an MC14013B, U7 (D-type flip flop). The
battery-backed CMOS clock circuitry remains active during
SPU; access only to read or write is inhibited. The system
power up, (SPU), signal is IS200STCIS6AED used to re-enable board access
and may be active from 4.7 volts typical to 4.85 volts
maximum. The SPU one shot U2, has a time-out of 5 ms to
allow for stable power supply voltage before enabling board
access. Because of the level at which the BCLK module
becomes re-enabled, the user must set the power supply
voltage at the board bus interface, connector J1, to a
minimum of 4.9 volts (5 volts recommended)
Adjustment of R2 establishes the voltage level at which tlie
MDX-BCLK module recognizes power fail. This’ level is
factory set at 4.7 volts and should not be changed. If R2
requires adjustment, the following procedure should be
used:
‘
- a) Adjust a power supply such that 4.7 volts is present on
the 5 volt input (Pins 1 and 2 on J1).
- b) Connect an oscilloscope or a voltmeter to the output of
the ICL8211 (Pin 4 of U1).
- c) Adjust R2 until the voltage on Pin 4 of the ICL8211 goes
to a high level (greater than 2.4 V).
- d) Slowly adjust R2 in the opposite direction until the
voltage goes to a low level (less than .7 V).
- e) The ICL8211, U 1 provides 50 mV hysteresis typically
between system power up sig
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen