Description
GE General Electric Technical Specifications: IS200TBTCH1CAA
With the introduction ofthe MDX-FLP2, the MDX-FLP1 will
become IS200TBTCH1CAA increasingly less cost effective due to the
performance increases ofthe MDX-FLP2. With this in mind,
this application note will detail the differences between
these two products so that present users of MDX-FLP1 can
IS200TBTCH1CAA make the move to MDX-FLP2 with a minimum of effort
The major differences between the MDX-FLP1 and MDX
FLP2 are in the areas of the floppy controller chip, jumper
options, 1/0 port definitions, and miscellaneous board
differences.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200TBTCH1CAA | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
Even though the software differences between FLP2 and
IS200TBTCH1CAA FLP1 are not very large, the implications of double-density
operation versus single-density operation should not be
underestimated. First of all, the data comes off the disk
IS200TBTCH1CAA twice as fast as it does for single-density operation. This
increased speed means that for programmed tranfers the
software must be more efficient if there is to be no lost data.
Secondly, the buffers must be twice the size they are for
single-density operation because the sectors are twice as
big.
Another area that the programmer must be aware of is that
of the different format information required for single- and
double-density operation. The single-density formats for
FLP1 and FLP2 are identical. Table 5 shows the format
information for IBM System 34 double-density operation. A
few notable points are the sector length field (field after
sector #), increased length of all gaps, and the different
values placed into the gaps. Table 6 shows the values
placed into the sector length field and what they mean. Note
that this table is only valid when bit b3 of Type II commands
isa “one”. If this bit is a “zero”, then the sector length field is
treated as non-IBM format and it is beyond the scope ofthis
application note to discuss all the possibilities of non
standard formats.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen