Description
GE General Electric Technical Specifications: IS200TRTDH1B
Selects whether fault type indication on output relays 4 to 7 is enabled. When
enabled, relays 4 to 7 will operate to indicate the type of the most recent fault
i.e. Fault Location #0 Fault Type. The auxiliary relays are reset to their non
operated state after the relay is reset. Any combination of relays 4 to 7 may be
IS200TRTDH1B operated and the outputs are designated as follows.
Phase A faults operate the 4 AUXILIARY relay.
Phase B faults operate the 5 AUXILIARY relay.
Phase C faults operate the 6 AUXILIARY relay.
IS200TRTDH1B Neutral faults operate the 7 AUXILIARY relay
Users utilizing the Fault Distance capability of the product may benefit from
having a fault distance message displayed along with other active conditions in
the relay. When set to Enabled, a fault distance message will be displayed
when a trip has occurred within the relay. The fault distance message will be
removed when the active conditions are reset. This message only appears
after the first TRIP condition; any subsequent TRIPs will only update the fault
distance value (if required).
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200TRTDH1B | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
The relay measures current demand on each phase, and three phase demand for real, reactive, and apparent
IS200TRTDH1B power. Setpoints are provided to allow the user to emulate some common electrical utility demand measuring
techniques, for statistical or control purposes.
The IS200TRTDH1B relay is not approved as or intended to be a revenue metering instrument. If used in a peak load
control system, the user must consider the accuracy rating and method of measurement employed,
and the source VTs and CTs, in comparison with the electrical utility revenue metering system.
This selection calculates a linear average of the quantity (RMS current, real power, reactive
power, or apparent power) over the interval between successive Start Demand Interval
logic input pulses. Each new value of demand becomes available at the end of each pulse.
See S3 LOGIC INPUTS \ MISCELLANEOUS \ START DEMAND INTERVAL to program the input for the
new demand interval pulses.
Rolling
Demand
This selection calculates a linear average of the quantity (RMS current, real power, reactive
power, or apparent power) over the programmed demand time interval, in the same way as
Block Interval. The value is updated every minute and indicates the demand over the time
interval just preceding the time of update.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen