Description
GE General Electric Technical Specifications: IS200TSVOH1BCB
The IS200TSVOH1BCB Transfer scheme is intended for application to a set of three circuit breakers, two of which, (Incomers 1
and 2) connect sources of electrical energy to two busses which can be paralleled through the Bus Tie breaker.
Normal configuration of the system is with both incoming breakers closed and the bus tie breaker open. Figure
14–2: SETPOINT CONTROL (2 OF 3) on page 14–4 shows this arrangement. The equipment designations on
IS200TSVOH1BCB this drawing will be used in the discussion.
The transfer scheme is used to minimize the effect of outages on one of the incoming supplies by opening the
incoming breaker connected to that supply, and then re-energizing the dead bus by closing the bus tie breaker
to transfer the dead bus to the live source. To protect against damage to motors connected to the dead bus,
the bus tie breaker is not allowed to close, after a transfer has been initiated, until the decaying (sometimes
called residual) voltage on the bus has been reduced to a safe level.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200TSVOH1BCB | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
After the lost source has been reestablished, the scheme provides three methods to restore the system to nor
IS200TSVOH1BCB mal configuration, two manual and one automatic. If the sources cannot be synchronized, the bus tie breaker
must be manually opened before the open incomer can be manually closed. In this procedure the incomer will
only be allowed to close if the incoming source (line VT) voltage is above a live threshold and the load (bus VT)
voltage is below a dead threshold value. If the sources are synchronized with synchrocheck supervision, it is
IS200TSVOH1BCB possible to manually close the open incomer to parallel all three breakers. The scheme will then automatically
open a breaker that had been previously selected to trip if all three breakers become closed. In this instance,
the bus tie breaker is ‘Selected To Trip’ and will open. The automatic method of returning the system to normal
configuration uses the undervoltage tripped portion of the restoration scheme.
In addition to the relay required for each of the three circuit breakers, it is required to connect one contact from
a three-position switch to each relay. This switch (device 43/10) is used to select the breaker that will trip after
all breakers become closed. It is also recommended that a two-position switch (device 43/83) with three con
tacts be connected to each relay as an ‘Auto-Off’ transfer scheme selector.
Because a relay is required on the bus tie breaker, it allows bus-splitting operation. This is accomplished by
setting the time overcurrent elements in the relay on the bus tie breaker to trip faster than the incomers, open
ing the bus tie before an incomer when operating from only one source.
The scheme can be used in conjunction with both non-drawout and drawout switchgear. Drawout switchgear
designs can make use of an auxiliary switch that confirms that the monitored breaker is in the ‘Connected’
position, and is therefore ready for operation. Fixed breaker installations can use contacts on the associated
isolating disconnect switches (if available) for this purpose. The scheme design can be applied to:
- Substations with no signaling from upstream equipment.
- Substations with an upstream circuit breaker equipped with a trip signal (94).
- Substations with a source transformer and transformer fault detection signal (86T).
- Both 1 and 2 above.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen