Description
GE General Electric Technical Specifications: IS200TVIBH2BBB
The 750 and 760 have five channels for AC current inputs, each with an isolating transformer and an automatic
IS200TVIBH2BBB shorting mechanism that acts when the relay is withdrawn from its case. There are no internal ground connec
tions on the current inputs. Current transformers with 1 to 50000 A primaries may be used.
Verify that the relay’s nominal input current of 1 A or 5 A matches the secondary rating of the
connected CTs. Unmatched CTs may result in equipment damage or inadequate protection.
IMPORTANT: The phase and ground current inputs will correctly measure to 20 times the cur
rent input’s nominal rating. Time overcurrent curves become horizontal lines for currents
above the 20 × CT rating. This becomes apparent if the pickup level is set above the nominal
CT rating.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200TVIBH2BBB | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
There are two dedicated ground inputs referred throughout this manual as the ‘Ground Current’ and the ‘Sensi
tive IS200TVIBH2BBB Ground Current’ inputs. Before making ground connections, consider that the relay automatically calcu
lates the neutral (residual) current from the sum of the three phase current phasors. The following figures show
three possible ground connections using the ground current input (terminals G10, H10) and three possible sen
sitive ground connections using the sensitive ground current input (terminals G3, H3).
The ground input (terminals G10, H10) is used in conjunction with a zero sequence CT as source, or in the
neutral of wye-connected source CTs. The ground current input can be used to polarize both the neutral and
sensitive ground directional elements. When using the residual connection set the Ground CT Primary setpoint
to a value equal to the Phase CT Primary setpoint.
The sensitive ground current input is intended for use either with a CT in a source neutral of a high-impedance
grounded system, or on ungrounded systems. On ungrounded systems it is connected residually with the
phase current inputs. In this case, the Senstv Gnd CT Primary setpoint should be programmed to a value
equal to the Phase CT Primary setpoint. The sensitive ground current input can be connected to a zero
IS200TVIBH2BBB sequence CT for increased sensitivity and accuracy when physically possible in the system.
Units that do not have the Sensitive Ground input (such as older units which have been upgraded
with new firmware) will use the G3, H3 terminals as the polarizing input. Terminals G10, H10 are
used for the Ground input. These connections will be shown on the terminal assignment label on the
back of the relay’s case.
The Sensitive Ground input (G3, H3 terminals) must only be used on systems where the maximum
ground current does not exceed 500 A.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen