Description
GE General Electric Technical Specifications: IS200VPROH1B
This element is used as an input to transfer scheme logic in this application, and therefore the function setpoint
IS200VPROH1B must be set to Control. An Undervoltage 3 operation is used to signal relay 2 to block transfer initiation from
that relay, because source 1 is experiencing low voltage. Also, 27-3 is enabled by instantaneous overcurrent to
block transfer initiation. This ensures that if a fault on the load side of bus 1 causes a dip below the undervolt
IS200VPROH1B age pickup setting, transfer will not be initiated until the voltage has risen above the voltage setting for the inter
val established by the TRANSFER DELAY THIS SOURCE setpoint. The pickup setting of 27-3 should be below the
minimum expected normal (low) voltage, usually around 0.9 Pick Up voltage. A Definite Time curve with the
delay set to zero provides instantaneous operation. The minimum operating voltage must be set to zero.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200VPROH1B | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
This element is used as an input to transfer scheme logic in this application, and therefore the function setpoint
IS200VPROH1B should be set to Control. An Undervoltage 4 operation is used to initiate a transfer on loss-of-source. Typical
settings have a pickup about 0.7 to 0.8 of Pick Up voltage, a curve setting selected as ‘Inverse Time’, and a
delay setting to provide operation in 0.7 to 1.4 seconds at 0 volts. The minimum operating voltage must be set
to zero.
IS200VPROH1B Synchrocheck (25) (Incomers 1 and 2 only)
The synchrocheck function can be selected as either Control or Alarm. It is imperative that setpoint DEAD
SOURCE PERMISSIVE be set to LL&DB (Live Line and Dead Bus) to allow initial closing of the incoming breakers.
The user establishes all other setpoints for this element.
IS200VPROH1B Synchrocheck (25) (Bus Tie only)
This element is used to provide synchronism check supervision when paralleling the busses. The Dead Source
Permissive portion of this feature is also used to measure the residual voltage on the bus that has lost source.
To ensure that transfers are supervised by the decayed voltage magnitude only, the ‘in-synchronism’ elements
are blocked while a transfer is in progress. The synchrocheck function can be selected as either Control or
Alarm. It is imperative that setpoint DEAD SOURCE PERMISSIVE be set to either DL|DB (Dead Line or Dead Bus)
or DLXDB (Dead Line or Dead Bus, but not both) to allow for transfers to either incomer.
The DEAD BUS MAXIMUM VOLTAGE and DEAD LINE MAXIMUM VOLTAGE setpoints establish the level of decayed volt
age above which transfers are inhibited. A normal setting for this element is about 0.25 Pick Up of nominal volt
age. Because the 750/760 measures a single phase-phase voltage, these values should be multiplied by 1 / √3
to cover the case of a phase-ground fault on a measured phase reducing that phase voltage but leaving the
other two phases at a higher voltage. If experience shows this setting causes a delay of transfer presenting
problems, it is occasionally raised to a maximum of 0.40 Pick Up. The user establishes all other setpoints for
this element.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen