Description
GE General Electric Technical Specifications: IS200VTCCH1CBD
The following conventions are used for the remainder of this chapter:
- It is assumed the relay VT and CT inputs are wired in accordance with Figure 3–9: TYPICAL WIRING DIA
GRAM on page 3–7. With these connections, and assumed where ever phase angles are noted, a unity
IS200VTCCH1CBD power factor current in the primary circuit flows into the relay current marked terminal, with no phase shift
with respect to the corresponding phase-neutral voltage.
- Phase rotation of the relay test set is ABC.
- A current which lags a voltage has a positive phase angle.
- Phase A to neutral voltage is indicated by Van (arrowhead on the “a“).
- Phase A to B voltage is indicated by Vab (arrowhead on the “a“).
- The sign convention for power parameters is as shown in Section 6.3.6: POWER on page 6–11.
- The actual value display at the beginning of some sections is the display for the measured parameter. All
IS200VTCCH1CBD actual values are mentioned with their “path” as a means of specifying where to find the particular mes
sage. For instance, the analog input, which in the message structure is located under actual values page
A2 METERING as the first message under subheading ANALOG INPUT, would be written as: A2 METERING \ ANA
LOG INPUT \ ANALOG INPUT.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200VTCCH1CBD | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
Excluding the tests which check the data acquisition of AC system currents and voltages, tests may be per
IS200VTCCH1CBD formed using the powerful simulation feature of the relay, without the need of external AC voltage and current
inputs. System parameters, such as current and voltage phasor information, are entered as setpoints. When
placed in simulation mode, the relay suspends reading actual AC inputs, and uses the programmed phasors to
generate sample values which are placed in the Trace Memory. All metering calculations and logic associated
with protection, monitoring, and control, are performed normally, using phasors calculated from the samples
IS200VTCCH1CBD placed in the memory instead of phasors generated from the input parameter data acquisition system. The
advantage of using simulation is that all metering calculations can be proven without the inaccuracies associ
ated with current and voltage sources.
Assuming that the simulation feature is not used, the following equipment is necessary to perform any test
included in this chapter:
General Purpose:
- 3φ variable AC current and voltage source (V, A, φ, Hz)
- 3φ power multimeter (V, A, φ, Hz, W, var, VA, Wh, varh, PF)
- variable DC mA source
- accurate timing device
- multimeters
Specific Purpose:
- Synchrocheck requires two single phase variable voltage sources with adjustable frequency and phase.
- Underfrequency requires a dynamic relay test set with at least two preset modes.
- Distance-to-fault: requires a dynamic relay test set with at least three preset modes.
- Analog Input Rate-of-Change requires a DC current generator with the capacity to generate current ramps
adjustable for duration’s from 1 minute to 2 hours, from 0-20 mA.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen