The procedure to test this element is identical to that outlined in Section 17.7.5: PHASE INSTANTANEOUS
IS200VTURH1A Characteristics
- Set a current of 0.2 of nominal and inject into the ground current input (terminals G10,H10).
- Set a 3Io current to 0.2 of nominal and in-phase with the ground current (this is the trip direction) and inject
into the relay via the phase current inputs.
- Increase the lagging angle of 3Io. At an angle lagging the ground current by 90 ± 2°, any output relays pro
IS200VTURH1A grammed for this condition should operate if the function is set to Control. If the function is set to Alarm,
check that the ALARM and MESSAGE indicators are flashing, the Neutral Directional Reverse alarm mes
sage is displayed, and any output relays programmed for this condition are operated.
- Continue to increase the lagging angle until the block message disappears at an angle lagging the ground
current by 270 ± 2°. Turn the current off.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200VTURH1A | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
IS200VTURH1A Test Connections per Figure 17–5: NEUTRAL DIRECTIONAL TEST CONNECTION WITH POLARIZING
IS200VTURH1A CURRENT.
As operations of each neutral directional sensing element have been checked under voltage and current polar
ization, it is only necessary to check that both directional elements are operational, and that either element can
IS200VTURH1A block tripping for reverse faults.
- Set Van to 60%, and Vbn = Vcn to 100% nominal voltage at phase angles of 0°, 120°, and 240°, respec
tively.
- Inject a current of 0.2 x nominal into the phase current input of the relay (3Io) at an angle outside the trip
ping region of the set MTA, as compared to faulted phase voltage Van. The Neutral Directional Reverse
alarm should appear.
- Inject a current of 0.2 x nominal, lagging the 3Io current by 180°, into the ground current input. The block
alarm should remain.
- Increase the angle of the ground current lagging 3Io current through a complete 360° rotation back to the
original angle of lagging by 180°. The block alarm should remain throughout the rotation as the voltage
polarized element is still blocking.
- Maintaining the ground current angle lagging 3Io by 180° increase the angle of 3Io lagging the Van voltage
through a complete 360° rotation back to the original angle. The block alarm should remain throughout the
rotation as the current polarized element is still blocking.
- Increase the angle of the ground current lagging 3Io current until the currents are in-phase. The block alarm
should remain.
- Maintaining the ground current angle in-phase with 3Io increase the angle of 3Io lagging the Van voltage
until into the permitted region. The block alarm should disappear when the angle reaches the tripping
region
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen