Description
GE General Electric Technical Specifications: IS200VVIBH1CAB
Test Connections per Figure 17–1: RELAY TEST WIRING – WYE CONNECTION or Figure 17–2: RELAY
IS200VVIBH1CAB TEST WIRING – DELTA CONNECTION on page 17–4.
- Set the Delay time to 0.
- Inject current at a level below the pickup level into phase A.
- Slowly increase the current until pickup is reached and the element generates an output.
- Slowly reduce the current until the element resets, which should be 2% of CT less than pickup when
pickup ≤ CT or 97 to 98% of pickup when pickup > CT.
- Repeat steps 2 to 4 for phase B and C current.
- Set the Delay timer to the required setting.
IS200VVIBH1CAB Indications and Operations caused by the various Functions are as outlined under Phase Time O/C,
with the following exception.
There is no Trip function for this element.
Timing:
- Set the test source to a current at least 110% of pickup. Turn off and reset the timer.
- Inject current into the relay and measure the time to operate.
- Repeat step 2 four more times and obtain an average of the time intervals
- Disconnect the Stop Trigger.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200VVIBH1CAB | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
IS200VVIBH1CAB Test Connections per Figure 17–1: RELAY TEST WIRING – WYE CONNECTION or Figure 17–2: RELAY
TEST WIRING – DELTA CONNECTION on page 17–4.
- Clear demand data registers before starting this test.
- Inject a fixed value of current. Monitor the actual value of the measured demand, and note the level at
which the feature generates an output. Turn the current off.
Indications and Operations caused by the various Functions are as outlined under Phase Time O/C,
with the following exception:
There is no Trip function for this element.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen