Description
GE General Electric Technical Specifications: IS200WETAH1A
This IS200WETAH1A test requires equipment which is seldom readily available in the field. It is suggested that as this feature
does not require extreme levels of reliability and security it is not necessary to be field-tested. (A procedure is
available upon request for those users wishing to perform this test.
We suggest the following procedure to confirm this element is operational.
- Check the value displayed under A3 \ MAINTENANCE \ ARCING CURRENT \ TOTAL ARCING CURRENT for each
IS200WETAH1A phase. Set the TOTAL ARCING CURRENT LIMIT to a level just above this value. Now perform a number of O/C
element tests, with current maintained after the Trip command, until this element generates an output.
- Be sure to reset the Total Arcing Current memory and setpoint at the end of this test.
Indications and Operations caused by the various Functions are as outlined under Phase Time O/C,
with the following exceptions.
There is no Trip function for this element.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200WETAH1A | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
- Disconnect the IRIG-B input to the relay from the signal source.
- Under S1 RELAY SETUP \ CLOCK manually set the relay date and time to incorrect values.
- Under A1 STATUS \ CLOCK check that the relay has accepted the programmed date and time.
- Set the IRIG-B Time Sync setpoint to the required signal type – the relay should display self-test warning
IRIG-B Failure.
- IS200WETAH1A Connect the IRIG-B input from the signal source to the relay and check the signal is available at the relay
terminals.
- Self-test warning IRIG-B Failure should be removed from the display.
- Under A1 STATUS \ CLOCK check that the relay clock now displays the correct date and time.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen