Description
GE General Electric Technical Specifications: IS200WETCH1APR2
IS200WETCH1APR2 Neutral Time OC 1 Raised Pickup
Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.
Ground Time OC Raised Pickup
Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.
IS200WETCH1APR2 Sensitive Ground Time OC Raised Pickup
Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.
Neg Seq Time OC Raised Pickup
Follow the procedure outlined for Phase Time O/C 1 Raised Pickup, injecting current as appropriate.
IS200WETCH1APR2 Select Setpoint Group
Apply a manual close and verify that the selected setpoint group becomes active when the breaker closes. Ver
ify that settings return to the previous setpoint group after the MANUAL CLOSE BLOCK TIME expires.
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | IS200WETCH1APR2 | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
Test Connections per Figure 17–1: RELAY TEST WIRING – WYE CONNECTION or Figure 17–2: RELAY
TEST WIRING – DELTA CONNECTION on page 17–4.
IS200WETCH1APR2 Procedure To Check:
Function and Timer Control:
- Enable the Cold Load Pickup setpoint to cause the relay to go into cold load pickup operation after the set
point Outage Time Before Cold Load expires. Check that any selected output relays have operated. If the
function is selected as Alarm, the alarm message and LED should also be turned on.
- Inject a current in any phase below 10% of nominal, and slowly increase. The relay should go into cold
load operation when the current is above 10% of nominal. The alarm message and LED should reset and
any output relays programmed to operate should dropout after a time interval equal to the cold load pickup
block time. This interval can be checked in the Event Recorder.
- Reduce this current to 3% of nominal and simultaneously start a timer. This feature should generate an
output at the end of the OUTAGE TIME BEFORE COLD LOAD setting
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen