Description
Model: VMIVME-5576,Due to the large number of goods, only some goods have been uploaded. If you can’t find the goods you want, please consult the seller, and we will serve you wholeheartedly.
SOME OF THE COMPONENTS ASSEMBLED ON VMIC’s PRODUCTS MAY BE SENSITIVE TO
VMIVME-5576 ELECTROSTATIC DISCHARGE AND DAMAGE MAY OCCUR ON BOARDS THAT ARE SUBJECTED
TO A HIGH ENERGY ELECTROSTATIC FIELD. UNUSED BOARDS SHOULD BE STORED IN THE
SAME PROTECTIVE BOXES IN WHICH THEY WERE SHIPPED. WHEN THE BOARD IS TO BE
PLACED ON A BENCH FOR CONFIGURING, ETC., IT IS SUGGESTED THAT CONDUCTIVE
MATERIAL BE INSERTED UNDER THE BOARD TO PROVIDE A CONDUCTIVE SHUNT.
Upon receipt, any precautions found in the shipping container should be
VMIVME-5576 observed. All items should be carefully unpacked and thoroughly inspected for
damage that might have occurred during shipment. The board(s) should be checked
for broken components, damaged circuit board(s), heat damage, and other visible
contamination. All claims arising from shipping damage should be filed with the
carrier and a complete report sent to VMIC together with a request for advice about the
disposition of the damaged item(s).
brand | Product Name | Product model | Order No |
GE Fanuc | Module card | VMIVME-5576 | nothing |
Place of Origin | Marketable land | Imported or not | defects liability period |
Europe and America | Nationwide and overseas | yes | a year |
Place of shipment | Delivery method | How to use | Applicable industries |
Xiamen | Shunfeng Express | Commissioning and installation | Power Plant Steel Plant Cement Plant Shipboard Papermaking |
Service advantages | Foreign import, goods preparation and supply | Reasonable price and reliable quality | Pictures are for reference only |
Product features | Primary source of goods, supply by model | After sales guarantee | Chen 1810693-7731 |
VMIVME-5576 Before applying power to the VMEbus chassis in which the board is
installed, execute the following checklist to ensure that the board has been correctly
prepared for operation.
- Verify that the sections pertaining to programming and configuration,
Section 4 and 5, have been reviewed and applied to system
requirements. _____
- Review Section 5.4 and Table 5.4-1 to verify that all jumpers are
configured correctly for the application. _____
- Verify that the I/O cables are properly terminated for the input/output
connectors. Refer to Section 5.6 for connector descriptions. _____
- Physical installation should have been completed as described in
Section 5.2. _____
- Ensure that all system cable connections are correct.
Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de
livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!
Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen