GE WESDAC D20 PS Central processing module

Product name:
GE WESDAC D20 PS Central processing module

Product model: WESDAC D20 PS

Quantity: inventory

Part No./PN:WESDAC D20 PS

Warranty: We provide warranty service for WESDAC D20 PS

Shipping Port:FuJian

Product technical documents: no relevant documents

Category:
Whatsapp:+86 15359293870
WeChat:+86 18106937731
                E-mail:geabbdcs@gmail.com
Contacts:kelly CHEN

Description

Model: WESDAC D20 PS,Due to the large number of goods, only some goods have been uploaded. If you can’t find the goods you want, please consult the seller, and we will serve you wholeheartedly.

The CPE400 is shipped with a real-time clock (RTC) battery installed on an internal circuit board (see

Figure 7). This battery will need to be replaced periodically by a qualified service technician. Typically,

no action is required during initial installation.

Should the RTC battery fail, the CPU date and time will be reset to 12:00 AM, 01-10-2000 at start-up.

The CPU operates normally with a failed or missing RTC battery; however, the initial CPU time-of-day

(TOD) clock information will be incorrect.

There are no diagnostics or indicators to monitor RTC battery status. The RTC battery has an

WESDAC D20 PS estimated life of 5 years and must be replaced every 5 years on a preventative maintenance

schedule.

WESDAC D20 PS To replace a depleted battery:

  1. Power down the CPE400.
  2. Disconnect the external cables attached to the CPE400, labelling each for later reconnection.
  3. Remove the CPE400 from its installed location.
  4. Take the CPE400 to a clean environment.
  5. Remove the DIN-rail or panel-mount adaptor plate, as applicable.
  6. Place the CPE400 on a workbench so that the heat-sink adjacent to the GE logo on the front

panel is facing up.

  1. With ESD protection in place, remove the four screws holding the upper side heat sink in place.
  2. Remove the heat sink. This exposes the circuit board, connectors and coin battery shown in

Figure 7.

 

brand Product Name Product model Order No
GE Fanuc Module card WESDAC D20 PS nothing
Place of Origin Marketable land Imported or not defects liability period
Europe and America Nationwide and overseas yes a year
Place of shipment Delivery method How to use Applicable industries
Xiamen Shunfeng Express Commissioning and installation Power Plant Steel Plant Cement Plant Shipboard Papermaking
Service advantages Foreign import, goods preparation and supply Reasonable price and reliable quality Pictures are for reference only
Product features Primary source of goods, supply by model After sales guarantee Chen 1810693-7731

 

  1. Take care to collect any thermal pads that may have been dislodged. These will be needed

WESDAC D20 PS during reassembly.

  1. While removing, or replacing the battery, take care not to damage the nearby ribbon cable (not

shown).

  1. Using a non-conductive pliers, grip the battery and simultaneously hold back the retaining clip so

it is clear of the battery.

  1. Remove the depleted battery and dispose of it by an approved method.
  2. Install the replacement battery so that the inscribed positive face is up.
  3. Check that the retaining clip has engaged the edge of the newly installed battery.
  4. Apply any dislodged thermal pads to the surface of the corresponding components on the circuit

board.

  1. Replace the heat sink.
  2. Tighten all four retaining screws to 0.6Nm.
  3. Reattach the adaptor plate removed in step 5.
  4. Restore the CPE400 module to its original location and secure it in place.
  5. Reconnect all cables to their original connectors.
  6. Turn power back on.
  7. If needed, set the current date and time via Proficy Machine Edition.

The replacement battery must be IC690ACC001 from GE Automation & Controls, or an equivalent,

such as Rayovac™ Lithium BR2032 Coin Cell 3V 190mAh -40°C to +85°C.

Why are the prices of many products of our company more competitive?
(1) Source purchase to reduce the price difference in the intermediate phase
(2) Stable channel and more guaranteed supply
Lead time problem
(1) For the spot products in stock, the de

livery can be arranged on the same day after the contract payment is signed
(2) Order products and deliver according to the quoted delivery date
Xiamen Xiongba adheres to the enterprise philosophy of “improving the value of spare parts supply chain”,
For the simple purchase procedure of spare parts, ensure that they are delivered to the site in a timely manner, and help users reduce the risk of downtime caused by the shortage of spare parts
The emergency spare parts support service is complete, and the user can customize the spare parts. The quality of the spare parts is reliable. All the spare parts provided enjoy a one-year super long warranty
Spot stock, fast response, reduce user capital investment, improve spare parts utilization, spare parts replacement!

Details: If you need urgent delivery orders, please feel free to contact us, and we will try our best to meet your needs.
Price problem: If you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.
Contact us:+86 181 0693 7731
Mail: 2872270648@qq.com
Contact: Chen