PFTL201C 10KN 3BSEN07913R10 ABB Pressure conductor load cell pillow block

Numer modelu: PFTL201C 10KN 3BSEN07913R10

Manufacturer: ABB
Quantity:ten
Serial ports: 2
Network ports: 9
Port isolation: 120 VDC
Weight : 3Kg
Shipping Weight : 4 Kg

Category:
Whatsapp:+86 15359293870
WeChat:+86 18106937731
                E-mail:geabbdcs@gmail.com
Contacts:kelly CHEN

Description

Manufacturer ABB
Brand ABB
Series module
Part Number PFTL201C 10KN 3BSEN07913R10
Product Type module
Quality 100% New Original
Stock In stock
Delivery time 1-3 days after Payment
After-sales Service Have
Warranty 1 year
Shipping term DHL / FEDEX/ EMS /UPS/TNT/EMS

 

Packaging details: if you need an urgent delivery order, please feel free to contact us, and we will do our best to meet your needs.

Price problem: if you find that other suppliers offer cheaper prices for the same product, we are also willing to provide you with reference prices and give you further discounts.

 

The instructions below apply to a typical mounting arrangement. Variations are allowed,
provided that the requirements of Section E.4, Installation Requirements are complied with.
If it is necessary to use tubular dowel pins to secure the position of the load cell,
see instructions in Figure E-3.
1. Clean the foundation and other mounting surfaces.
2. Fit the lower adapter plate to the load cell.
Tighten the screws to the torque stated in Table E-1.
3. Fit the load cell and the lower adapter plate to the foundation,
but do not fully tighten the screws.
4. Fit the upper adapter plate to the load cell.
Tighten the screws to the torque stated in Table E-1.
5. Fit the bearing housing and the roll to the upper adapter plate,
but do not fully tighten the screws.
CAUTION
During this operation it is possible to over load the load cells if the operation is
done not careful enough, especially if the roll is heavy. The most critical load
cells are naturally the PFTL 101A-0.5 kN and PFTL 101B-2 kN. Applications
with inclined mounting are most critical.
6. Adjust the load cells so that they are in parallel with each other and in line with the axial
direction of the roll. Tighten the foundation screws, see Table E-1.
7. Adjust the roll so that it is at right angles to the longitudinal direction of the load cells.
Tighten the screws in the upper adapter plate, see Table E-1.